3D models and maps for exploration and mining companies

Turn your drill data into a 3D story investors understand.

Interactive 3D models, films and maps built from your own data and checked line by line by a geologist with 20+ years in the field.

Work on your project starts immediately.

Real data from a producing gold mine, with names and places withheld. Play the guided story, then turn and zoom the model yourself.

Exploration

Gold project in Canada, for a listed exploration company

What they had

LiDAR terrain, satellite images, soil and rock samples and the full drill database in spreadsheets.

What they got

Seven interactive 3D models and a film. The client's names are removed here.

Where it is used

Investor presentations, the company website and news releases.

The film, with the client's names removed.

Explore three of the real models

Each model opens in a window on this page and takes a few seconds to load. The models are in English.

On a phone, watch the film above. The interactive models are best opened on a computer.

Mining

Operating gold mine in Africa

What they had

2,379 drill holes and 202,089 m of drilling, from close spaced grade control in the pits to deep diamond holes, with assays and rock logs.

What they got

A guided 3D story of the mine in 13 scenes, from the regional setting to three cross sections, and a film. The company's name and the place are withheld.

Where it is used

The investor page of the company website, investor meetings and quarterly reports.

The film of the mine, with the company's name removed.

Operating gold mine, main mine area

Open the 3D model →

How the model sits on a company's investor page (invented company).

For producing mines

  • Near-mine drilling and model updates
  • Pit progress compared with the model
  • Maps and sections for quarterly reports
  • Drill database upkeep
Tell us about your project

On a phone, watch the film above. The interactive models are best opened on a computer.

Maps and figures

Every map and figure an exploration company or a mine needs

3D figures

  • Ore bodies and high grade zones in 3D
  • Cut away blocks and open pit views
  • Weathering profile and depth to fresh rock

Drilling and sections

  • Drill plans for news releases
  • Long sections with pierce points and grades
  • Cross sections with rock types and intercepts
  • Monthly maps for every news release

Location and area

  • Location and regional maps with nearby deposits
  • Licence maps from the official cadastre
  • Constraint maps: reserves, villages, protected ground

Property and targets

  • Property maps with access, roads and infrastructure
  • Target maps that rank where to drill next
  • Artisanal workings mapped from satellite images
  • LiDAR terrain and structural maps

Geology, geochemistry and geophysics

  • Geological maps and compilations
  • Soil, rock and grab sample maps
  • Magnetics, VLF and IP with interpreted conductors

Schematics and plans

  • Deposit model schematics
  • Site plans with pits, dumps and plant
  • Hydrogeology: water sources for the project
  • Historical images and old maps brought to coordinates

Click a picture with a magnifier to see the whole figure.

From recent projects

Client names, project names and coordinates are hidden.

Long section of drill holes with lithology and iron grades
Drill section with lithology, gold assays and intercepts

Before and after

From a drill table to a model investors can turn in their hands

Before: your assay table
HoleFrom mTo mGold, g/t
DH26-0223.0023.620.53
DH26-0224.4024.702.40
DH26-0224.7025.502.30
DH26-0513.9015.104.84
DH26-0515.1016.400.95
DH26-0517.5018.100.66
DH26-0518.7019.00>5
DH26-0525.9026.101.22

Real intervals from two holes of the gold project in Canada, hole names changed. The same holes are in the model.

After: interactive 3D model

Drag to turn the model, scroll to zoom.

Before: your rock log
HoleFrom mTo mRock type
DH26-0215.7023.62Altered tonalite
DH26-0223.6224.70Chlorite ankerite schist
DH26-0224.7026.04Altered tonalite
DH26-0512.1013.10Chlorite schist
DH26-0513.1017.50Altered tonalite
DH26-0517.5019.10Quartz vein
DH26-0519.1021.10Altered tonalite
DH26-0521.1022.00Chlorite schist

Rock types logged in the same two holes, around the gold.

From drill results to investors

What you need to show investors, ready when you need it

Everything can be delivered in English, French, Spanish and Chinese, checked by a native speaker.

How it works

Delivery in 2 to 5 days

Delivery takes 2 to 5 days, depending on the size of the job. Work on your project starts immediately, with the aim of delivering a quality result as early as possible.

  1. 01

    You send the data

    Drill tables, terrain, maps and the legend you already use.

  2. 02

    Data check

    Every inconsistency is listed before modelling starts.

  3. 03

    One model to review

    You correct colours, labels and views on a single model first.

  4. 04

    Final files

    All agreed models, the film and a note of the checks made.

20+years in exploration
4continents
7countries: Indonesia, Mongolia, Kenya, Tanzania, Congo, Canada, Chile
4languages: English, French, Spanish, Chinese

Pricing

Plans for every stage of your project

Choose a monthly plan or a single job. Every plan lists exactly what you receive.

One month free with yearly billing

Results

For companies that report drill results.

US$1,5001,375 per month

2.5 working days a month included

Invoiced at the end of each month, three months minimum

Yearly price, invoiced at the end of each month. You save US$ 1,500 a year

Tell us about your project
  • News releases
  • Usually 2 news release packs a month
  • Map, section and 3D image in every pack
  • Video of 20 to 30 seconds for social media in every pack
  • Express work: usually within 2 working days of complete data
  • 1 round of changes to every pack
  • 3D model
  • Interactive 3D model built in the first month
  • Model updated with every new hole
  • Private link that opens the model in any browser
  • Languages
  • Everything in English
  • Service
  • Reply within 1 working day
  • Urgent work gets priority
Most chosen

Investor

For companies that are raising money.

US$2,4002,200 per month

4 working days a month included

Invoiced at the end of each month, six months minimum

Yearly price, invoiced at the end of each month. You save US$ 2,400 a year

Tell us about your project
  • More than Results
  • 2 rounds of changes to every pack
  • Guided story on the model, 8 to 10 scenes
  • Investor presentation reworked, then kept current
  • One-page project summary, updated after every release
  • Project page on one link, kept online by us
  • Neighbourhood map of mines and deposits
  • News releases
  • Usually 2 news release packs a month
  • Map, section and 3D image in every pack
  • Video of 20 to 30 seconds for social media in every pack
  • Express work: usually within 2 working days of complete data
  • 3D model
  • Interactive 3D model built in the first month
  • Model updated with every new hole
  • Private link that opens the model in any browser
  • Languages
  • Everything in English
  • Service
  • Reply within 1 working day
  • Urgent work gets priority

Full

For companies that want everything handled.

US$4,8004,400 per month

8 working days a month included

Invoiced at the end of each month, six months minimum

Yearly price, invoiced at the end of each month. You save US$ 4,800 a year

Tell us about your project
  • More than Investor
  • Usually up to 4 news release packs a month
  • Priority work: usually within 1 working day for a standard pack
  • The project in five pictures
  • Two conference packs a year: film, poster and QR code
  • Data room kept in order
  • Data check with every new batch of results
  • Signed data certificate once a year
  • French, Spanish and Chinese, checked by a native speaker
  • Reply the same working day
  • News releases
  • Map, section and 3D image in every pack
  • Video of 20 to 30 seconds for social media in every pack
  • 2 rounds of changes to every pack
  • 3D model
  • Interactive 3D model built in the first month
  • Model updated with every new hole
  • Private link that opens the model in any browser
  • Guided story on the model, 8 to 10 scenes
  • Investor material
  • Investor presentation reworked, then kept current
  • One-page project summary, updated after every release
  • Project page on one link, kept online by us
  • Neighbourhood map of mines and deposits
  • Languages
  • Everything in English
  • Service
  • Urgent work gets priority

Investor and Full run for at least six months, the other plans for at least three months. After that a plan can be cancelled at any time.

Each plan is a monthly block of working days. The list shows what usually fits into it, not a fixed promise. Work beyond the block is agreed with you first and charged at US$ 800 a day.

A news release pack is one drill plan map, one section, one 3D image and one video of 20 to 30 seconds, for up to 15 new holes. More figures or more holes count as extra time.

Single jobs

Mapfrom US$ 550
Static 3D imagefrom US$ 850
Interactive 3D modelfrom US$ 1,400
News release packfrom US$ 950 per release
3D filmfrom US$ 4,500

Everything else: a fixed quote within one working day.

Tell us about your project

Payment after the work is done: single jobs are invoiced on delivery, plans at the end of each month for the work delivered. By bank transfer.

Gold, copper, lithium, rare earths, uranium and more, anywhere in the world. Urgent work at no extra charge.

Terms and payment →

Technical services

The same care for the technical work of your team

Licence maps, old data, report figures and 3D work for your exploration team. The geological interpretation stays with your geologist.

Questions

Common questions

Do we need a 3D model, or will a section do?

If the story is one vein seen from one side, a good long section is often enough. A 3D model earns its place when there are several zones, a plunging shoot, or a large property where location matters. You will get an honest answer about which one fits your data.

What data do you need?

Collar, survey, assay and rock type tables in Excel or CSV, a terrain surface from LiDAR or a digital elevation model, and the map legend you already use. A geological map or a block model can be added too.

Can investors open it without special software?

Yes. The model is one web file that opens in any browser on a computer or a phone. It can go on your website, into a data room or into an email.

Can the model be updated after new drill results?

Yes. New holes are added to the same model, so each news release can come with an updated view.

Who owns the model and the data?

You do. Your data is used only for your model and is never shown or shared without your written permission.

How do we pay?

By bank transfer in US dollars, after the work is done. Single jobs are invoiced on delivery, plans at the end of each month for the work delivered that month.

Tell us about your project

Send the project name and what you need. You receive a fixed offer within one working day.

Contact

Write to us

Tell us where the project is and what data you have. You will receive a reply within one working day.

Based in Dubai. You receive a reply the same working day in Perth, across Africa, in London and in Toronto.