
3D figures
- Ore bodies and high grade zones in 3D
- Cut away blocks and open pit views
- Weathering profile and depth to fresh rock
3D models and maps for exploration and mining companies
Interactive 3D models, films and maps built from your own data and checked line by line by a geologist with 20+ years in the field.
Work on your project starts immediately.
Exploration
LiDAR terrain, satellite images, soil and rock samples and the full drill database in spreadsheets.
Seven interactive 3D models and a film. The client's names are removed here.
Investor presentations, the company website and news releases.

Open the 3D model →

Open the 3D model →

Open the 3D model →
Each model opens in a window on this page and takes a few seconds to load. The models are in English.
On a phone, watch the film above. The interactive models are best opened on a computer.
Mining
2,379 drill holes and 202,089 m of drilling, from close spaced grade control in the pits to deep diamond holes, with assays and rock logs.
A guided 3D story of the mine in 13 scenes, from the regional setting to three cross sections, and a film. The company's name and the place are withheld.
The investor page of the company website, investor meetings and quarterly reports.

Open the 3D model →

On a phone, watch the film above. The interactive models are best opened on a computer.
Maps and figures






Click a picture with a magnifier to see the whole figure.
Client names, project names and coordinates are hidden.
Before and after
| Hole | From m | To m | Gold, g/t |
|---|---|---|---|
| DH26-02 | 23.00 | 23.62 | 0.53 |
| DH26-02 | 24.40 | 24.70 | 2.40 |
| DH26-02 | 24.70 | 25.50 | 2.30 |
| DH26-05 | 13.90 | 15.10 | 4.84 |
| DH26-05 | 15.10 | 16.40 | 0.95 |
| DH26-05 | 17.50 | 18.10 | 0.66 |
| DH26-05 | 18.70 | 19.00 | >5 |
| DH26-05 | 25.90 | 26.10 | 1.22 |
Real intervals from two holes of the gold project in Canada, hole names changed. The same holes are in the model.

Drag to turn the model, scroll to zoom.
| Hole | From m | To m | Rock type |
|---|---|---|---|
| DH26-02 | 15.70 | 23.62 | Altered tonalite |
| DH26-02 | 23.62 | 24.70 | Chlorite ankerite schist |
| DH26-02 | 24.70 | 26.04 | Altered tonalite |
| DH26-05 | 12.10 | 13.10 | Chlorite schist |
| DH26-05 | 13.10 | 17.50 | Altered tonalite |
| DH26-05 | 17.50 | 19.10 | Quartz vein |
| DH26-05 | 19.10 | 21.10 | Altered tonalite |
| DH26-05 | 21.10 | 22.00 | Chlorite schist |
Rock types logged in the same two holes, around the gold.
From drill results to investors
Everything can be delivered in English, French, Spanish and Chinese, checked by a native speaker.




How it works
Delivery takes 2 to 5 days, depending on the size of the job. Work on your project starts immediately, with the aim of delivering a quality result as early as possible.
Drill tables, terrain, maps and the legend you already use.
Every inconsistency is listed before modelling starts.
You correct colours, labels and views on a single model first.
All agreed models, the film and a note of the checks made.
Pricing
Choose a monthly plan or a single job. Every plan lists exactly what you receive.
For companies that report drill results.
2.5 working days a month included
Invoiced at the end of each month, three months minimum
Yearly price, invoiced at the end of each month. You save US$ 1,500 a year
Tell us about your projectFor companies that are raising money.
4 working days a month included
Invoiced at the end of each month, six months minimum
Yearly price, invoiced at the end of each month. You save US$ 2,400 a year
Tell us about your projectFor companies that want everything handled.
8 working days a month included
Invoiced at the end of each month, six months minimum
Yearly price, invoiced at the end of each month. You save US$ 4,800 a year
Tell us about your projectKnow what happens around your licences.
0.5 working days a month included
Invoiced at the end of each month, three months minimum
Yearly price, invoiced at the end of each month. You save US$ 300 a year
Tell us about your projectYour maps, drawn and kept in one style.
4 working days a month included
Invoiced at the end of each month, three months minimum
Yearly price, invoiced at the end of each month. You save US$ 2,400 a year
Tell us about your projectA technical office on call.
10 working days a month included
Invoiced at the end of each month, three months minimum
Yearly price, invoiced at the end of each month. You save US$ 6,000 a year
Tell us about your projectInvestor and Full run for at least six months, the other plans for at least three months. After that a plan can be cancelled at any time.
Each plan is a monthly block of working days. The list shows what usually fits into it, not a fixed promise. Work beyond the block is agreed with you first and charged at US$ 800 a day.
A news release pack is one drill plan map, one section, one 3D image and one video of 20 to 30 seconds, for up to 15 new holes. More figures or more holes count as extra time.
Everything else: a fixed quote within one working day.
Tell us about your projectPayment after the work is done: single jobs are invoiced on delivery, plans at the end of each month for the work delivered. By bank transfer.
Gold, copper, lithium, rare earths, uranium and more, anywhere in the world. Urgent work at no extra charge.
Technical services
Licence maps, old data, report figures and 3D work for your exploration team. The geological interpretation stays with your geologist.
Your ground and everything around it, from the state register.
Fixed quote within one working dayAsk for this →A report every month on what changed around you.
Fixed quote within one working dayAsk for this →Paper maps and old reports turned into data you can use.
Fixed quote within one working dayAsk for this →Where small-scale miners work, and how that changed.
Fixed quote within one working dayAsk for this →For NI 43-101 and JORC reports.
Fixed quote within one working dayAsk for this →A 3D modeller when your team needs one.
Fixed quote within one working dayAsk for this →Survey files made ready for your software.
Fixed quote within one working dayAsk for this →All your maps in one style.
Fixed quote within one working dayAsk for this →Questions
If the story is one vein seen from one side, a good long section is often enough. A 3D model earns its place when there are several zones, a plunging shoot, or a large property where location matters. You will get an honest answer about which one fits your data.
Collar, survey, assay and rock type tables in Excel or CSV, a terrain surface from LiDAR or a digital elevation model, and the map legend you already use. A geological map or a block model can be added too.
Yes. The model is one web file that opens in any browser on a computer or a phone. It can go on your website, into a data room or into an email.
Yes. New holes are added to the same model, so each news release can come with an updated view.
You do. Your data is used only for your model and is never shown or shared without your written permission.
By bank transfer in US dollars, after the work is done. Single jobs are invoiced on delivery, plans at the end of each month for the work delivered that month.
Send the project name and what you need. You receive a fixed offer within one working day.
Contact
Tell us where the project is and what data you have. You will receive a reply within one working day.
Based in Dubai. You receive a reply the same working day in Perth, across Africa, in London and in Toronto.
Write to us or tell us about your project. You receive a short written offer with the price, the list of what is delivered and the delivery date. Work starts when you confirm the offer by email.
All prices are in US dollars. Payment is by bank transfer against an invoice, and bank charges are paid by the sender. Everything is paid after the work is done: single jobs are invoiced on delivery and the invoice is due within 7 days.
Plans are invoiced at the end of each month for the work delivered in that month, due within 7 days. They run for at least three months, the Investor and Full plans for at least six months, and can then be cancelled at any time. Yearly plans are invoiced the same way, at the yearly price.
The delivery date is agreed in the offer, or confirmed when complete data arrives. Delivery times on this page are typical times, not guarantees. The number of rounds of changes is listed with every plan and every job. Further changes are agreed in advance.
Your data is used only for your work. It is never shown or shared without your written permission. We sign your confidentiality agreement on request.
The final files are yours once the invoice is paid.
Our maps, models and checks present your data. They are not a mineral resource estimate, a valuation or investment advice, and they do not replace the report of a Competent Person or a Qualified Person.
Questions about these terms: tijana@geo3dstudio.com